EQUIPMENT ISSUE // FIELD ISSUE // 2026

MATCH BALL

RESERVATION WINDOW OPENARCHIVE ISSUE EQ-026-001LIMITED RELEASE

The object that starts every story.

Every tournament creates moments. A goal in stoppage time. A last minute save. A strike that changes history. The Match Ball sits at the center of all of them, built as a tribute to football's most important object in navy and signal orange.

  • Navy and signal orange panel colorway.
  • Issue markings and barcode detailing.
  • Built as a collectible artifact, not a kickabout ball.
PRICE SET AT DEPLOYMENTLIMITED RELEASE  //  RESERVATION WINDOW OPEN
QUANTITY
1
No price, no payment. Reserving adds you to the waiting list and signals demand for this exact issue. Price is set when the collection deploys.
ISSUEEQ-026-001
REGIONNORTH AMERICA 2026
FIELD OPS Match Ball.
01 / 01
WHY THIS EXISTS

Some objects help play the game.

Others help tell its story.

You are not purchasing a football. You are preserving the object at the center of the game.

MATERIAL SPECIFICATION

FIELD OPS products are developed for repeated travel use rather than occasional event wear.

Materials are selected for durability, structure, color retention, and long term appearance.

Performance Priorities
  • Structure retention
  • Travel durability
  • Color stability
  • Abrasion resistance
  • Long term reliability

Every material is evaluated against the same requirement:

Would we want to carry this through a twelve hour travel day and still rely on it at the other end?

If the answer is no, it does not enter production.

PRODUCTION RECORD
CollectionFIELD OPS Launch Release
Production StatusPre Production Reservation Window
Release ClassificationFirst Release
AvailabilityLimited Production Run

FIELD OPS products are released in controlled production quantities rather than continuous inventory cycles. Once a production run concludes, future availability is determined by demand, manufacturing capacity, and collection strategy. Early reservation holders receive priority access before public release.

RELEASE TIMELINE
Current PhaseReservation Window
Next PhaseProduction Confirmation
Following PhasePriority Access Release
Final PhasePublic Availability (Subject To Inventory)

Reservation holders receive launch communication before public release begins.

CARE & MAINTENANCE

Built for the field.

Recommended Maintenance
  • Wipe clean with a damp cloth
  • Air dry fully before storage
  • Avoid prolonged direct heat
  • Store in a cool dry place
  • Do not machine wash

Proper maintenance preserves finish, structure, and performance throughout the life of the product.

WHY RESERVE NOW

The inaugural FIELD OPS release represents the first documented release of the project.

Reservation holders receive
  • Priority access before public release
  • Launch notifications
  • Inventory allocation priority
  • Collection updates
  • Early purchase opportunity

No payment is required today. A reservation simply secures your position before access opens to the public.

FIELD OPS™ ARCHIVE RECORDEQ-026-001
COLLECTIONEquipment Issue
UNITField Issue // 2026
ISSUEEQ-026-001
SPEC0.8 bar // 450g // 69cm
FINISHMatte Panel
AUTHENTICATED // ENTERED INTO THE FIELD OPS ARCHIVE // NORTH AMERICA 2026
COMPLETE THE DEPLOYMENT
FIELD ISSUE // 2026  //  ARCHIVE ISSUE EQ-026-001

THE OBJECT THAT STARTS EVERY STORY.

Built for the world stage and the collection that documents it.

ENTER THE FIRST DEPLOYMENT LIST
NORTH AMERICA 2026  //  LIMITED RELEASE  //  THE OBJECT THAT STARTS EVERY STORY.